- SKU:
- royal-grey-shaker-sample-door
Royal Grey Shaker Sample Door Overview
Compare the color and finish in person before ordering your cabinets.
Samples ship out same day before 12pm Mon-Fri. After 12pm samples will ship out the next business day. All samples are refundable!
Shipping & Returns
Product Specifications
Royal Grey Shaker features full-overlay Shaker doors.
The specifications below describe the matching kitchen cabinets, not the sample door.
| Sample Door Shipping Time: | Samples ship out same day before 12pm EST, Mon-Fri. After 12pm samples will ship out the next business day |
| Shop this RTA Style: | Shop Royal Grey Shaker RTA cabinets |
| Cabinetry Shipping Time: | Ships in 3-7 business days |
| Style: | Shaker |
| Face Frame: | 1-1/2" Solid Birch |
| Door Frame: | Solid Birch |
| Door Center: | MDF |
| Door Frame Width: | 3" |
| Center Panel Beveled Edge: | Yes (slight bevel) |
| Sides: | 1/2" plywood |
| Top & Bottom (Wall): | 1/2" plywood |
| Bottom (Base): | 1/2" plywood |
| Back Panel: | 1/4" - 3/8" plywood with a 1/2" frame around the panel for added installation stability and strength |
| Shelves: | 3/4" plywood |
| Base Cabinet Shelf Depth: | 1/2 |
| Drawer Box: | Dovetailed, 5/8" drawer box with 5-piece drawer front |
| Drawer Glides: | Undermount, full extension, soft close drawer glides |
| Base Corner Supports: | Wood corner brackets |
| Overlay: | Full |
| Hinges: | Concealed, 6-way adjustable, soft close hinges |
| Cabinet Interior: | UV coated, natural interior |
| Center Stile: | None |
| Assembly Method: | Dado assembly with a two-carton system: one carton contains the cabinet box components, and the other contains the face frame. |
| Finish: | 7-step acid catalyzed (AC) stain finish process, with an AC top coat |
| Toe Kick: | 1/2" plywood |
| Installation Rail: | 1/2" plywood (1-1/2" narrower than cabinet width) |
| Wall Cabinet Bottoms Finished (Exterior): | Yes (side panel bottom edges will be unfinished) |
| CARB Compliant: | Yes |
| Door Hinges: | Hinged right by default, hinge pilot holes are also pre-drilled on the left side of the face frame. For base cabinets, the hinges from the right side of the face frame can be removed, then screwed into the pilot holes on the left, for a left hinged door. Wall cabinets can have the door flipped around for a left hinge install. |
| Toe Kicks Included w/Base Cabinets: | Natural toe kicks are included, but matching 8' toe kicks (TK96) must be purchased separately to finish the toe kick area and cover gaps between adjacent cabinets. |
| Sides Panels Finished: | Natural side panels; skins must be purchased separately for exposed sides. |
| Installation/Designer Note: | A 1/2" filler is recommended for full-overlay doors. The door will clear without a filler, but clearance will be minimal. The cabinet depth measurement listed is the depth from the front of the face frame to the back of the cabinet, and does not include the cabinet door depth. Cabinet specs are subject to change without notice. *Cabinet measurements are typically converted from metric to inches and manufacturers will commonly round up to the nearest 1/4 inch. This can cause a measurement to be off by a fraction of an inch (less than 1/4") which is within normal industry standards* Schematic images and renderings are generic and may not represent exact construction details for each collection. The exact specifications for this collection can be found in the construction details listed above. |
Login and Registration Form