- SKU:
- graphite-grey-shaker-sample-door
Graphite Grey Shaker Sample Door Overview
Compare the color, finish, and construction in person before ordering your cabinets.
Samples ship out same day before 12pm Mon-Fri. After 12pm samples will ship out the next business day. All samples are refundable!
Shipping & Returns
Product Specifications
Graphite Grey Shaker features a grey painted finish and full-overlay Shaker doors. Plywood cabinet boxes, dovetailed solid-wood drawers, and soft-close doors and drawers come standard.
The specifications below describe the matching kitchen cabinets, not the sample door.
| Sample door shipping time: | Samples ship out same day before 12pm Mon-Fri. After 12pm samples will ship out the next business day |
| Shop this collection: | Shop Graphite Grey Shaker RTA cabinets Shop Graphite Grey Shaker pre-assembled cabinets |
| Cabinet shipping time: | Ships in 3-7 business days |
| Style: | Shaker |
| Face frame: | 3/4" x 1-3/4" birch |
| Door frame: | 3/4" Premium HDF (HDF is used to avoid cracking/warping) |
| Door center: | Premium HDF (HDF is used to avoid cracking/warping) |
| Door frame width: | 3" |
| Sides: | 1/2" A-grade plywood |
| Top & bottom (wall): | 1/2" A-grade plywood |
| Bottom (base): | 1/2" A-grade plywood |
| Back panel: | 1/2" A-grade plywood full back |
| Shelves: | Adjustable 3/4" shelves with front edge banding |
| Base cabinet shelf depth: | 1/2 |
| Drawer box: | 5/8" solid-hardwood dovetailed drawer box with a 5/16" plywood bottom and 5-piece drawer front construction |
| Drawer glides: | 70 lb capacity, undermount, full-extension, soft-close glides |
| Base corner supports: | 3/4" solid-wood corner blocks |
| Overlay: | Full |
| Hinges: | 6-way adjustable, concealed, European soft-close hinges |
| Cabinet interior: | UV Coated Natural Interior (Prepped-for-glass cabinets will be finished to match the cabinet fronts) |
| Center stile: | None (unless listed in the cabinet description) |
| Assembly method: | Metal Clip or Glue & Staple: Cabinets come with Metal Clips (Cleats - not already installed on the cabinets) that can be used to assemble or the cabinets can be Glued and Stapled. If Staple & Glued, clips will not be used |
| Finish: | 7-step, acid-catalyzed finish process with a UV coating |
| Toe kick: | 1/2" plywood |
| Installation rail: | None |
| Wall cabinet bottoms finished (exterior): | Yes |
| CARB compliant: | Yes |
| Door hinges: | Doors come pre-drilled for the hinges, the face frame has marks where to drill and the customer chooses Right or Left during assembly. |
| Toe kicks included with base cabinets: | Yes, but there will be a small gap when two cabinets are side by side, so the TKC (8' toe kick) is needed if cabinets are next to each other. |
| Side panels finished: | Yes |
| Installation/design note: | Cabinet specs are subject to change without notice. *Cabinet measurements are typically converted from metric to inches and manufacturers will commonly round up to the nearest 1/4 inch. This can cause a measurement to be off by a fraction of an inch (less than 1/4") which is within normal industry standards* |
Login and Registration Form